Take a moment to view a cross-section of recent projects representing a breadth of work with our partners.
RNL Design (now Stantec) commissioned MG to conduct a firm-wide technology assessment. Under MG’s guidance and support RNL developed a consistent and professionally maintained content library, deliberate and measurable workflow processes and standardized software deployments with automated updates.
Palmer Hamilton is a leader in mobile, flexible, and storable furniture solutions for K-12, higher education, healthcare, civic and corporate environments. MG supported the company as they transitioned their software proficiencies and digital assets from 2D CAD to a 3D BIM platform.
In 2017, the City of Madison determined the need to transition from Bentley-based platforms for their in-house engineering tools to Autodesk products. The City needed software migration training, and customized solutions tailored to the specifics of each City department.
The United States Olympic & Paralympic Museum is a privately funded cultural resource being built in Colorado Springs, CO to honor the achievements of U.S. Olympians and Paralympians. MG was contracted by the museum to develop the Diamond Donor panel adoption program as a means of raising funding for future exhibits.
As a premier window and door dealer, Window Design Center was contracted by the University of Wisconsin-Stout to replace beautiful, but nonuniform windows in many of the school’s historic buildings. MG streamlined the process.
Johnson Controls wanted to verify their new Shanghai Asia-Pacific Headquarters’ building was being designed and built to achieve expectations for operational efficiency, the company turned to MG and Autodesk to conduct a blind, third-party evaluation.